價格:免費
更新日期:2018-10-10
檔案大小:3.4M
目前版本:3.1.1
版本需求:Android 4.0 以上版本
官方網站:mailto:regpubs@gmail.com
Email:http://regpub.com/google-play-privacy-policy/
29 CFR 1926 - OSHA Construction
Subpart V - Electric Power Transmission and Distribution
Data is current as of March 8, 2019
Table of Contents:
§1926.950 - General.
§1926.951 - Medical services and first aid.
§1926.952 - Job briefing.
§1926.953 - Enclosed spaces.
§1926.954 - Personal protective equipment.
§1926.955 - Portable ladders and platforms.
§1926.956 - Hand and portable power equipment.
§1926.957 - Live-line tools.
§1926.958 - Materials handling and storage.
§1926.959 - Mechanical equipment.
§1926.960 - Working on or near exposed energized parts.
§1926.961 - Deenergizing lines and equipment for employee protection.
§1926.962 - Grounding for the protection of employees.
§1926.963 - Testing and test facilities.
§1926.964 - Overhead lines and live-line barehand work.
§1926.965 - Underground electrical installations.
§1926.966 - Substations.
§1926.967 - Special conditions.
§1926.968 - Definitions.
Appendix A to Subpart V of Part 1926 - [Reserved]
Appendix B to Subpart V of Part 1926 - Working on Exposed Energized Parts
Appendix C to Subpart V of Part 1926 - Protection From Hazardous Differences in Electric Potential
Appendix D to Subpart V of Part 1926 - Methods of Inspecting and Testing Wood Poles
Appendix E to Subpart V of Part 1926 - Protection From Flames and Electric Arcs
Appendix F to Subpart V of Part 1926 - Work-Positioning Equipment Inspection Guidelines
Appendix G to Subpart V of Part 1926 - Reference Documents